Calculate Array Formulas in a PMS
The first project management software that lets you calculate SQL formulas. Get ready to crunch numbers and uncover insights with Quire.
Join the DZone community and get the full member experience.
Join For FreePicture this: You're looking at your project management software, and you're like, "Wait, do array formulas even belong here?" I mean, we usually think of formulas as those things that just add or subtract numbers, right? Well, hold that thought.
Because here's the deal: when you've got a bunch of tasks in a project, each doing its own thing, you need to be the master of metrics to succeed. That’s where array formulas swoop in to save the day. In this blog post, I'm going to show you how these fancy formulas can jazz up your data game.
What Are Array Formulas?
An array is a collection of data, such as tasks, assignees, durations, and numbers. An array formula allows you to perform multiple calculations within the selected collection of data, i.e., an array.
For example, if you’d like to calculate the schedule variant of a task, you can write a formula as follows:
timeSpent - estimated
Then, if you would like to calculate the schedule variance of all subtasks, you can write a formula as follows:
subtasks.timeSpent - subtasks.estimated
It might look alien to you — I’ll explain it later. Here, you just need to know, in the above formula, subtasks
is a collection of subtasks, and with array formulas, you can simply subtract one array from another by manipulating simple values.
Some Basic Array Operations That You Should Know
Within Quire’s formula, you can prepare an arbitrary array with [
and ]
. For example, you can have a collection of 1, 2, and 3 as follows:
[1, 2, 3]
Then, if you’d like to multiply with a value, you can do:
[1, 2, 3] * 5
The result will be:
[5, 10, 15]
Also, you can do a calculation for two arrays:
[1, 2, 3] - [2, 1, 3]
The result will be:
[-1, 1, 0]
OK, now we can explain the formula mentioned above:
subtasks.timeSpent - subtasks.estimated
Assuming we have three subtasks, their time spent is 1h, 2h and 3h, and estimated time 2h, 1h, 3h. Then, subtasks.timeSpent
is actually calculated to [1h, 2h, 3h]
, while subtasks.estimated
is calculated to [2h, 1h, 3h]
. And the result is [-1h, 1h, 0h]
.
Sorting and Filtering
The sort
Function
To sort a collection of data, you can simply use the sort
function:
sort([3, 1, 5, 2, 4]) * 2
It will return with the following result:
[2, 4, 6, 8, 10]
It is equivalent to sort(3, 1, 5, 2, 4) * 2
The limit
Operator
If you filter only the first three elements, you can use the limit operator as follows:
sort([3, 1, 5, 2, 4]) * 2 limit 3
The where
Operator
If you’d like to filter out smaller values, you can use the where operator as follows:
[3, 1, 5, 2, 4] where any > 4
It will return with the following result:
[3, 5]
any
is a keyword to represent each value in the array on the left of the where
operator.
The order by
Operator
Let us go back to the formula that calculates the schedule variance and play around with it: subtasks.timeSpent - subtasks.estimated.
It returns with the time variance of all subtasks. Now, assume we’d like to retrieve the tasks instead of the schedule variance, then we can use the order by the operator as follows:
subtasks order by any.timeSpent - any.estimated
The default ordering is ascending order. You can change it to descending with the desc
keyword as follows:
subtasks order by desc any.timeSpent - any.estimated
Here is a more advanced and complicated formula. Let’s try if you can tell what it is up to:
subtasks where any.timeSpent > 1d and any.due < tomorrow and any.priority >= high order by desc any.timeSpent - any.estimated limit 3
Knowing Your Project Dynamics With Array Formulas
Custom Field With Formulas
Applying this is a piece of cake — just create a custom field with a formula. Let's say you're all about keeping tabs on how much each task is costing you. First of all, you can define a custom field, say, Cost
to record the cost for each task.
Then, you can define another field, for example, Total Cost
to calculate the total cost of each task, including its subtasks, as follows.
There are a few things worth paying attention to:
- The formulas are case-insensitive. That is,
Cost
andcost
are equivalent. So areSUBTASKS
andsubtasks
. - If a field’s name contains spaces or other non-alpha-numeric characters, you have to enclose it with
{
and}
. It is why you see{Total Cost}
in the above formula.
Let us dig a bit further about how Total Cost
is calculated. At first, assume we have three tasks: A, B and C. And, B and C are subtasks of A. Also, you entered Cost
for A, B, C as 50, 30, 10, respectively. Then,
- The total cost of B and C will be 30 and 10, since they don’t have any subtasks.
- A’s total cost will be
SUM(30, 10, 50)
. It will be 90.
Summarize Project Dynamics in Its Description
Here's another cool way to use formulas — you can slip them right into the project description. Imagine you want to show the total project cost. Just jot down something like this in the project description:
Total cost: {{SUM(tasks.{Total Cost})}}
Where:
- The description is Quire-flavored markdown. To specify a formula, you have to enclose it with
{{
and}}
. Also, once entering{{
, an auto-complete dialog will help you to complete the formula. tasks
is a built-in identifier to represent all tasks in the project. Again, it is case insensitive.
If we’d like to know the five most expensive tasks, we can do the following:
{{tasks order by desc any.{Total Cost} limit 5}}
Or, you’d like to list the tasks that spent too much time:
{{tasks where any.timeSpent - any.estimated > 1d order by desc any.timeSpent - any.estimated limit 5}}
You can put the formula into any description as long as the markdown is supported, including tasks and comments. You can even summarize the performance of your colleagues by writing down the proper formulas in the description of their profile.
To learn and explore how Quire array formulas can help you, you can try it out in a task’s description. It is more convenient for trial and error.